Notice: Only variables should be passed by reference in /home3/murtazab/public_html/wp-content/themes/15zine/option-tree/ot-loader.php on line 329

Warning: Cannot modify header information - headers already sent by (output started at /home3/murtazab/public_html/wp-content/themes/15zine/option-tree/ot-loader.php:329) in /home3/murtazab/public_html/wp-content/plugins/wp-plugin-hostgator/vendor/newfold-labs/wp-module-ecommerce/includes/ECommerce.php on line 197

Notice: Function wp_enqueue_script was called incorrectly. Scripts and styles should not be registered or enqueued until the wp_enqueue_scripts, admin_enqueue_scripts, or login_enqueue_scripts hooks. This notice was triggered by the nfd_wpnavbar_setting handle. Please see Debugging in WordPress for more information. (This message was added in version 3.3.0.) in /home3/murtazab/public_html/wp-includes/functions.php on line 6078
Dubai to build world's first 3D printed office

Symbolic for its skyscrapers and high-rise buildings, in particular the world’s tallest building, the Burj Khalifa, Dubai has now revealed its plans to build the world’s first ever fully functional 3D printed office.

“This building will be a testimony to the efficiency and creativity of 3D printing technology, which we believe will play a major role in reshaping construction and design sectors. We aim to take advantage of this growth by becoming a global hub for innovation and 3D printing. This is the first step of many more to come.” H.E Excellency Mohammed Al Gergawi , UAE Minister Of Cabinet Affairs and The Chairman of UAE National Innovation Committee commented.

The project is the first major initiative of the ‘Museum of the Future’ and is part of a larger partnership between Dubai and WinSun Global – a joint venture between Chinese 3D printing technology firm WinSun and international investors – along with leading global architecture and engineering firms Gensler, Thornton Thomasetti, and Syska Hennessy.first-3d-printed-office-museum-of-future-dubai-02The building will be located close to the ‘Museum of the Future’, launched earlier this year in Dubai, and will act as temporary headquarters for its staff. The 2,000 square feet structure will be printed layer-by-layer using a 20-foot tall 3D printer and then assembled on site in a matter of weeks. All interior furniture, detailing, and structural components will also be built using 3D printing technology.
first-3d-printed-office-museum-of-future-dubai-03

Its design is based on in-depth research about the requirements of future work and represents the latest thinking in workplace design.  The space is open and flexible, allowing for a range of uses and team sizes, and will bring together professionals, community members, and experts through a mix of public and private events. It will also feature a small digital fabrication facility and a 3D printing exhibition space.

first-3d-printed-office-museum-of-future-dubai-04The project marks the beginning of an important transformation in the construction and design sector; the shift to 3D printing and digital fabrication.  This project will be the most advanced 3D printed structure ever built at this scale and the first to be put into actual use.